OEE Calculator

Discover how much your factory could gain by increasing OEE

This free OEE calculator shows, in under 1 minute, how much your factory could gain in production and savings by raising OEE.

Instant result Transparent assumptions 100% free
Your operation
units / year
Total units the factory produces per year.
people
Operators working directly on the line.
%
% of overtime relative to regular hours.
$ / hour
Salary + payroll taxes + benefits, per hour. E.g., $45/h.
Your OEE
%
Your average OEE today. Industry average sits between 50% and 65%.
points
How many points you expect to gain. E.g., from 55% to 70% = 15 points.
Your potential with Cogtive
$0
Recovered in labor costs · per year
0
Additional production · units per year
Projected OEE: 55%70%
Estimates based on the assumptions you provided and industry averages. The two results represent distinct scenarios (more output or lower cost) — they should not be added together. Actual gains vary by operation.
I want this result in my factory →
Success Stories

See how leading manufacturers increased OEE with Cogtive

Brasterápica, FQM, Axantia, Ourofino, Sandéleh, Granado, Nutriex, and JA Saúde Animal have already transformed their operations. Fill out the form to get all the full case studies.

Get all the case studies

It's free — the materials arrive in your inbox.

Instant delivery by email

Cogtive · Operational Excellence

Measuring is the first step. Improving is our job.

A spreadsheet shows the past. Cogtive collects OEE automatically, in real time, straight from your machines, and shows you exactly where to act to recover availability, performance, and quality.

Talk to a specialist →
FAQ

Frequently asked questions about OEE

The OEE formula is: OEE = Availability × Performance × Quality. Each factor ranges from 0 to 100%, and the final result is the product of all three.

An OEE of 85% is considered world-class. Most factories operate between 50% and 60%, and values below 40% indicate significant room for improvement.

In practice, no. 100% would mean producing only good parts, at maximum speed, with zero stoppages — something unattainable in real-world operations. That's why 85% is already treated as the standard for excellence.

OEE measures equipment efficiency, combining availability, speed, and quality. Productivity measures output per resource used (per hour or per employee). OEE helps explain why productivity is high or low.

To increase OEE, you need to reduce unplanned stoppages, eliminate speed losses, and cut down on scrap — tackling what's known as the six big losses. The first step is measuring in real time to identify exactly where each percentage point is being lost.