Formula, color and packaging changes every shift
Short changeovers, many times a day, that add up to hours of lost output each week.
Cosmetics and personal care manufacturing
Cogtive follows the line from filling to stock and standardizes every setup, so you produce more between one batch and the next without buying equipment.
A specialist replies within 2 business hours.

Cosmetics manufacturers that run on Cogtive






Where the line loses time
Formulas, colors and packaging change several times per shift. Without a standard and real data, the monthly plan only closes on the last day.
Short changeovers, many times a day, that add up to hours of lost output each week.
The same changeover takes a different time with each operator, and nobody knows which phase drifts.
Stops of seconds that vanish from manual entries and still pull down the line’s speed.
The monthly plan is only known to close, or not, on the last day.
How Cogtive solves it
Each pain maps to a pillar of the cockpit, on top of a complete OEE foundation.
Guided Setup on the tablet, with time per phase and the ramp-up measured after each changeover, so every shift follows the same standard.
Micro-stops and speed losses captured automatically, so the downtime Pareto shows where the line really loses output.
Adherence to the plan by SKU and New Pace, the daily target to close the month, recalculated with every production entry.
The whole route in sight, with WIP between stages and the bottleneck of the shift.
OEE tools give you a speedometer. Cogtive gives you the entire cockpit. See the whole platform →
Traceability
Batch changeovers, line clearance and cleanings recorded on the tablet, signed by PIN, with versioned templates and an audit trail, ready for internal audits and regulators.
Results


+117%
machine availability
Paper records were hiding the microstops on Nutriex's lines. With real-time OEE, downtime Pareto and a daily management routine, machine availability rose from 45% to 97.7%.

2×
production goal by 2030
To double production by 2030, Granado brought real-time OEE and Flow View to its Japeri plant, where around 1,000 employees work four shifts.
How we start
A short questionnaire with your team shows where the biggest loss is and what to connect first.
Data from IoT, sensors or the tablet. OEE, stops and losses in real time as soon as the first line is connected.
Our Customer Success team of Operational Excellence professionals runs the routine with yours, then expands where it makes sense.
We don’t sell what you won’t use yet. About the CAPTA method →
FAQ
Yes. Short changeovers repeated many times a day add up. Guided Setup records the time per phase, so you see which phase drifts and where the next improvement is.
The way your plant allows: IoT and sensors on the machines, cameras with AI Vision and entries on the tablet. Micro-stops are captured too, and older machines can start on the tablet.
No. Cogtive works alongside them. The MES records execution and the ERP plans; Cogtive manages flow, pace, setup and capacity on top of what actually happens on the shop floor.
No. A short CAPTA questionnaire shows where your operation stands, and we start with what creates value now. We don’t sell what you won’t use yet.
Book your demo
See the cockpit running on a line like yours. A specialist replies within 2 business hours.