A large SKU mix and shifting campaigns
The schedule changes every week, and every change costs another setup.
Animal health manufacturing · GMP
From weighing to filling, Cogtive shows where time is lost, shortens the setups of a large mix and releases the capacity you already have installed.
A specialist replies within 2 business hours.

Animal health manufacturers that run on Cogtive





Where capacity hides
A large mix of SKUs, long setups and campaigns accepted on gut feeling. The plant looks busy, and the volume still falls short.
The schedule changes every week, and every change costs another setup.
Cleaning, adjustment and checks done differently on every shift, with no standard to improve on.
Machines waiting for material or for the next order disappear from the entries and only show up at month-end.
The volume is committed before anyone knows whether the line can deliver it.
How Cogtive solves it
Each pain maps to a pillar of the cockpit, on top of a complete OEE foundation.
Guided Setup on the tablet turns SMED into a standard every shift follows, with phases, checklists and the time per phase recorded automatically.
Flow View shows every order from weighing to filling, the queue at each stage and the bottleneck of the shift.
Simulate campaigns and SKU mix and see the OEE each scenario requires, before you commit the volume.
OEE collected through IoT or the tablet app on each piece of equipment, with downtime Pareto, MTBF and MTTR.
OEE tools give you a speedometer. Cogtive gives you the entire cockpit. See the whole platform →
Shop-floor compliance · GMP
Cleanings, batch changeovers and maintenance are recorded on the tablet, signed by PIN and sealed once saved, with versioned templates, an audit trail and data integrity. A validatable solution.
Results


+29%
OEE
With 85 pieces of equipment connected through IoT and the tablet app, and the production flow followed in Flow View, Ourofino raised its OEE by 29% and saved about 600 hours a year.
“Through the virtualization and real-time tracking of the entire process, Cogtive improved our OEE by 29%.”

−69.7%
equipment wait time
With real-time OEE across two plants, JA Saúde Animal cut equipment wait time by 69.7% in 60 days, standardized setups with SMED and raised equipment performance by 25%.
How we start
A short questionnaire with your team shows where the biggest loss is and what to connect first.
Data from IoT, sensors or the tablet. OEE, stops and losses in real time as soon as the first line is connected.
Our Customer Success team of Operational Excellence professionals runs the routine with yours, then expands where it makes sense.
We don’t sell what you won’t use yet. About the CAPTA method →
FAQ
OEE shows how efficient a machine was. Cogtive also shows where each order waits, how long each setup phase takes and whether the next campaign fits, so the team knows what to do next.
Yes. Data comes in the way the plant allows: IoT and sensors where possible, entries on the tablet where not. At Ourofino, 12 pieces of equipment were connected through IoT and 73 through the tablet app.
No. Cogtive works alongside them. The MES records execution and the ERP plans; Cogtive manages flow, pace, setup and capacity on top of what actually happens on the shop floor.
No. A short CAPTA questionnaire shows where your operation stands, and we start with what creates value now. We don’t sell what you won’t use yet.
Book your demo
See the cockpit running on a line like yours. A specialist replies within 2 business hours.