Success stories
Results measured on the shop floor, not in a slide deck.
How manufacturers in pharma, animal health, cosmetics, supplements and food use the complete Lean cockpit to deliver more with the plant they already have.


−46%
lead time
With 51 pieces of equipment connected and every batch visible in Flow View, Apsen cut its lead time by 46% and postponed the investment in a new plant by more than four years.


+126%
OEE in 11 months
At its plant in Jordan, Axantia replaced spreadsheets with real-time shop-floor data and Flow View, raising OEE from 18.5% to 41.9% in 11 months without buying new machines.


+29%
OEE
With 85 pieces of equipment connected through IoT and the tablet app, and the production flow followed in Flow View, Ourofino raised its OEE by 29% and saved about 600 hours a year.


−47%
lead time
Real-time data from 16 machines, daily Gemba walks and pull production on 60% of the plant took Brasterápica's lead time from 12–15 days to 8 days while operations doubled.


+117%
machine availability
Paper records were hiding the microstops on Nutriex's lines. With real-time OEE, downtime Pareto and a daily management routine, machine availability rose from 45% to 97.7%.


−69.7%
equipment wait time
With real-time OEE across two plants, JA Saúde Animal cut equipment wait time by 69.7% in 60 days, standardized setups with SMED and raised equipment performance by 25%.


37% → 66%
line OEE in 2024
Jar collisions kept stopping Sandéleh's packaging line. With OEE and Flow View, the team found the cause, redesigned the conveyor and took line OEE from 37% to 66% in 2024.


2×
production goal by 2030
To double production by 2030, Granado brought real-time OEE and Flow View to its Japeri plant, where around 1,000 employees work four shifts.
- 100+
- manufacturers
- +30%
- production capacity
- 12×
- return on investment
- NPS +85
- customer satisfaction