Holding Time in Pharma: How to Measure and Control It

What holding time is in pharmaceutical manufacturing, the types that exist, how to measure each batch's wait against its validated limit and avoid deviations.

Operator in a hair net and green uniform adjusting a packaging machine in a pharmaceutical plant

Holding time is the maximum time a material may wait between two production stages without its quality being affected. In pharmaceutical manufacturing, that limit comes from a study, is recorded in the product documentation and applies to every batch: the granulate waiting for compression, the core waiting for coating, the bulk waiting for packaging. This guide explains what holding time is, the types that exist, how to measure it and how to control it before it turns into a deviation.

What holding time is

Every batch process has waits. A batch finishes one stage and sits until the next one starts, because the machine is busy, because QC release is pending or because the shift ended. Holding time (also called hold time) is the limit of that wait: the period within which the material, stored under the defined conditions, still meets its specifications.

That limit is not an estimate. It is set in a hold-time study, in which samples of the material are kept under the real storage conditions and tested over time. The World Health Organization has specific guidance for these studies (Annex 4 of Technical Report Series No. 992), and United States regulations require time limits for each phase of production, when appropriate (21 CFR 211.111). Good Manufacturing Practice follows the same logic: the wait needs a limit, and the limit needs a basis.

Exceeding the limit does not mean the batch is lost. It means opening a deviation, investigating and deciding, with data, what to do with it. That takes Quality’s time, holds the batch and adds to the lead time.

The types of holding time

In practice, a pharmaceutical plant controls three groups:

  • In-process materials: dispensed raw materials, prepared solutions and suspensions, granulate, final blend, cores, coated tablets and bulk product before packaging.
  • Dirty equipment (dirty hold time): the maximum time between the end of production and the start of cleaning.
  • Clean equipment (clean hold time): the maximum time clean equipment may wait before it is used again. Once it expires, the equipment is cleaned again.

Why OEE does not show holding time

Holding time happens between machines, not inside them. A granulate that has been sitting for two days in the queue for the tablet press does not lower the OEE of any equipment. The press may be running well, on another product, while the batch next to it ages toward its limit.

That is why, in pharmaceutical manufacturing, the biggest loss usually sits between stages. At Apsen, before Flow View, there was no information on how many batches were queued in front of each piece of equipment. With every batch visible on its route, the company reduced its lead time by 46%, as the Apsen case tells.

How to measure holding time

Measuring holding time means answering three questions for every batch and every stage: when the clock started, when it stopped and what the limit was.

  1. Define the points on the route. For each product, list every wait that has a limit and state unambiguously where the clock starts and where it stops. For example: from the end of final blending to the start of compression.
  2. Record the times where they happen. The end of one stage and the start of the next should be recorded on the spot, on the shop floor. A time written down later, from memory, will not support an investigation.
  3. Compare with the limit, batch by batch. The number that matters is not the average, it is how much of the limit each batch has already used.

An illustrative example: if a product’s study set 72 hours for the granulate and a batch has been waiting for 60 hours, it has already used 83% of its limit. It is still within the limit, but it only reaches the press in time if someone knows that now. The real limit for each material always comes from the product’s own study.

How to control holding time

Control means acting before the limit. Five practices make the difference:

  • A visible route. Every batch appears at its stage, with the waiting time running. The queue is no longer discovered on a walk down the corridor.
  • An alert before expiry. The warning reaches production and planning with time to react, not after the limit has passed.
  • Sequence by deadline. Each machine’s queue follows the right order, and the batch closest to its limit goes first.
  • Less material waiting. Only start a batch if the next stage has the capacity to receive it. Pull production limits the WIP between stages and, with it, the waiting time. At Brasterápica, 60% of the plant moved to pull production based on real demand, and lead time fell from 12–15 days to 8 days.
  • Auditable records. Who recorded it, when, and who changed it. At inspection, the batch history has to show that the limit was respected.

In practice: Flow at Cogtive

Cogtive is a Lean management framework for batch manufacturing, and holding time is part of the Flow pillar. Flow View is a live map of every batch on its route, with WIP, lead time per stage, FIFO and holding time against its limit, with an alert before time runs out.

At Axantia’s plant in Jordan, Pharma International Company, the team uses Flow View to track lead time, cycle time, route deviations and holding time for every order. Orders arrive from SAP, temperature and humidity come from the BMS, and audit trail reports show who recorded and who changed each entry. The Axantia case shows how this works day to day.

Data does not work alone. In the CAPTA method, Cogtive’s Customer Success team, which comes from the industry, helps the plant bring these alerts into the daily, weekly and monthly routine.

A quick test

Answer yes or no:

  • Do you know right now which batches are waiting and for how long, without walking to the shop floor?
  • Does the warning for a holding time close to its limit arrive before time runs out?
  • Are the end and start times of each stage recorded on the spot, not reconstructed afterwards?
  • Do you know how many holding time deviations the plant had this year, and at which stages?

If you answered no to two or more, holding time in your plant is being checked afterwards, not controlled.

Frequently asked questions

Are holding time and lead time the same thing? No. Lead time is the batch’s total time, from the release of materials to the release of the finished product. Holding time is the limit of one specific wait along that path. Controlling the waits reduces lead time, but they are different measures.

Who sets the holding time for each material? The company itself, through a hold-time study carried out under the real storage conditions, approved by Quality and recorded in the product documentation.

To see how Flow works in a pharmaceutical plant, explore Cogtive for the pharmaceutical industry and the success stories.